  • Hughes Hall Laboratory project encompassed the renovation of five chemistry labs on the Oxford campus. This is a three story building with a basement. The project required a complete interior demolition of existing walls and labs to make room for a new laboratory layout.
  • Presser Hall was originally built in 1930. Renovation of this historic building included ADA upgrades and new MEP and technology. The building houses 22 classrooms, 3 rehearsal rooms, first floor offices, and an electric studio.
  • Peaking Engine Generator is a one story steel construction with multiple intermediate levels. D.A.G. did an addition to existing building and an elevator extension. This was a highly complex project of 5000 sf. The site was very constricted. The building was completely blocked off on two sides. The other two sides only had about 25 to 30 feet of temporary road before dropping off the 20 foot retaining wall.

Role: General Contractor